City of Clinton

Streets

Streets

Clinton has nearly 175 miles of city streets and roads. Except for U.S. Hwy 80, and the exits around Interstate 20, which are handled by the Mississippi Department of Transportation (601-924-5452), the City's Public Works Street Department maintains the roadways.

  • To report Pothole, Missing Street Sign, or Traffic Signal Malfunction, call 601-924-2239
  • For Road Kill Pickup and Animal Control, call 601-924-5252
  • For Street Light Outage 1-800-9OUTAGE
  • For Resurfacing Information 601-925-6102

2016 Street Paving and Striping List

The following streets have been identified by the Street Department as the most critical streets in need of paving and striping. This list was resented to the Board of Aldermen for approval at the February 2, 2016 Board Meeting. Striping and paving will begin in March 2016 and will proceed until completion of the list or until paving funds have been exhausted.

Pavement Markings List

Street Name

From

To

Lakeview Drive

Old Vicksburg

Highway 80

Clinton Boulevard

College Street

City Limits

Northside Drive

St. Thomas Parkway

East of Monroe

Cynthia Street

Monroe Street

Northside Drive

College Street

Clinton Parkway

3 – Way Stop

Broadway Street

Highway 80

Hampstead Boulevard

Industrial Drive

Frontage Road

West Northside Drive

Woodchase Drive

Springridge Road

Johnston Place

Old Vicksburg Road

Northside Drive

John Hopkins

Paving List

Street Name

From

To

Pugh Road

Williamson Road

End

Lake Hollow Boulevard

Kickapoo Road

End

Lake Hollow Place

Lake Hollow Boulevard

End

McAlpin Road

Williamson Road

North Norrell Road

Saddlewood Drive

Northside Drive

End

Cedar Oak

Saddlewood Drive

End

Tall Oaks Road

Cedar Oak

End

Castlewood Drive

Magnolia Road

City Limits

Susie Lane

West Northside Drvie

End

Sproles Street

Monroe Street

Clinton Parkway

Vernon Road

Tarvin Street

Short Vernon Road

Tarvin Street

Vernon Road

Neal Street

Storm Drains

Public Works crews maintain drainage ways located within the City easements. This maintenance includes repairing sinkholes over drainpipes and along lined ditches, cleaning and preventative maintenance. A certified, bonded contractor conducts herbicide applications for certain improved ditches three (3) times per growing season.